Divide the minutes guests are there by the minutes one piece takes from hooping to trimming, then multiply by the number of machines you bring. At six minutes a piece, one machine finishes 10 pieces an hour, so a three-hour event fits about 30.

That number is the one you put on the host's quote as the pieces the hours include. It comes from your pace. The host's guest count does not change it.

The math on paper

Write down three numbers:

  • The hours guests can order. Count from the time the doors open to the time the last piece has to be handed back. Setup and teardown are not in it.
  • The minutes one piece takes you, start to finish.
  • How many machines you are bringing.

Then: hours × 60 ÷ minutes per piece × machines. Round down, because a piece that is half done at close is not done.

A few examples at six minutes a piece:

  • Two hours on one machine: 120 ÷ 6 = 20 pieces.
  • Three hours on one machine: 180 ÷ 6 = 30 pieces.
  • Four hours on two machines: 240 ÷ 6 = 40, times 2 = 80 pieces.

If your piece takes eight minutes, three hours on one machine is 180 ÷ 8 = 22.5, so 22 pieces.

How long does one piece take?

Longer than the stitching. A first name of five to seven letters runs about 2,000 stitches in my own records. The stitch count guide shows how to estimate a design you have not seen yet. My machine is a Melco Bravo, rated at 1,000 stitches per minute. So the name itself stitches in about two minutes at top speed.

The rest of the piece is everything around those two minutes. You hoop the item and the stabilizer, load the name, and check the placement. When the machine stops, you unhoop, trim the jump threads, cut the backing, and hand it back. Sewing Machine Fun points out that a 1,000-stitch design that stitches in three minutes can take 10 minutes to set up. A production shop on The Shirt Board multiplies its stitch time by 1.5 to cover hooping, trimming, and thread changes. A live event is harder on that overhead than a production run, because every piece is a new name and a new hooping.

That is why six minutes is a fair starting point for a name on a multi-needle machine. It matches what owners publish:

  • John Oliver Designs says it stitches about 10 items an hour, which is six minutes each. The same page says names and monograms are the fastest and larger designs take longer.
  • PartyInkers estimates 15 pieces an hour for its one-machine booth and 30 an hour for its two-machine booth, which is four minutes each. That booth runs with a crew, so treat it as a ceiling for a solo owner, not a target.

Time yourself before you promise a number

Published numbers come from someone else's machine, hands, and menu. Before you quote an event, stitch five pieces at your kitchen table exactly as you would at the booth. Use the same blank, font, and hoop you plan to bring. Start the clock when you pick up the blank. Stop it when the finished piece is folded on the table. Add up the five and divide by five.

Do it with your slowest menu item too. If you offer a name on a sweatshirt plus a monogram on a hat, time both. Hats need a slower embroidery speed than flat pieces. A cap frame also takes longer to load than a hoop. Your pace for the event is the slowest item guests can pick, unless you price or limit it separately.

What changes the number

The design. A bigger design or one with fills adds minutes. Wide satin stitches also run slower than top speed on some machines. Keep the event menu to short names and small icons. Then the pace holds.

The item. A tote hoops faster than a hat. A thick sweatshirt takes more care to hoop straight than a tee.

Thread changes. A one-color name is the fastest. On a multi-needle machine with the colors already loaded, a second color adds well under a minute. On a single-needle machine, every color change is you rethreading at the table.

A second machine. Two machines double the count only when someone keeps both of them fed. One owner running two machines hoops the next piece while the other stitches. That works at six minutes a piece. It falls apart if hooping takes longer than the stitching. A helper on orders and handoffs is often what makes the second machine pay.

The guests. The machine pace is not the only line. A guest who takes five minutes to pick a font holds up everyone behind them. Pre-orders before the day and a short printed menu keep the order line moving so the machine line is the only one you are timing.

When more guests come than fit

Do the math against the host's guest count before you send the quote. Say the host expects 46 guests for three hours and you fit 30 on one machine. You have three honest fixes. The host picks one:

  • Add hours. You finish 10 more each hour, so two more hours finishes all 46.
  • Add a second machine. Two machines in three hours finish 60, which covers everyone.
  • Keep the hours and stitch the rest after the event at your per-piece rate. Then ship them or have them picked up.

Put the one the host picks on the quote. Writing the per-piece rate plus the after-event invoice into the quote is covered in how to quote a live embroidery event, so a party booked for 25 that gets 46 is already settled in writing.

The last-order time

On the day, the number that matters is the work left against the time left. Multiply the pieces waiting by your minutes per piece and divide by your machines. If 22 pieces are waiting at six minutes each on one machine, that is 132 minutes of work, or 2 hours 12 minutes. If close is 90 minutes away, you are already past the point where everyone gets their piece today.

Set a last-order time and post it at the table. Work back from close: the last order is the time when the work already in line fills the minutes left. Stop taking orders at that time, even if the line looks short. A guest who orders after it either waits past close or leaves without the piece. That is the guest who remembers the event. Pieces you stitch after close for guests who ordered in time follow your terms. They get shipped or picked up at the per-piece rate.

How Broidry does this math

Every live event in Broidry has a Your pace card. You type the machines at the event and the minutes one piece takes. It starts at one machine and six minutes. Once the event has its start and end times, the card says how many fit, for example "This event fits about 30 pieces in 3 hours on 1 machine." When the guest count the host gave you is bigger than that, the card says what fixes it: "46 guests is more than the 30 pieces that fit. Add 2 hours or a second machine (60 pieces) to finish everyone." The Your pace card and the Quote the host card are on the Maker plan.

On the day, the queue board does the last-order math for you. Its header shows the pieces in line, the minutes of work they add up to, plus the time left to close. It turns red when the line runs past close. Pressing Stop guest orders on the board closes the guest link. Each guest's own order page shows how many are ahead of them and about how long until their piece is done. The queue board is on the Shop plan. The live embroidery events page shows the whole day, from the guest's QR order to the close-out.

The short version

Time one piece from picking up the blank to folding it on the table, using your slowest menu item. Divide that into the minutes guests can order and multiply by your machines. Six minutes a piece is 10 an hour on one machine. Check the host's guest count against that number before you quote. Then set a last-order time on the day so every guest who ordered gets their piece.

Run your whole shop from one place.

Broidry tracks every order, quote, and payment in one place. Broidry is free until your first sale, with no credit card to start.